The 10-Minute Rule for I&e Roofing & Construction
To avoid this, the side of the starter tile ought to extend past the drip side. How far? "Starter tiles ought to overhang the eaves and rake side by inch to inch," said https://declankxyt359123.bloginwi.com/72918442/i-e-roofing-construction-things-to-know-before-you-get-this