Installation Overview At a prominent confectionery site in York, Newsome has installed a efficient 400 kW chiller, marking the timely realisation of the project. This initiative demonstrates a notable step forward in the client’s ESG framework, enhancing operational resilience and ensuring measurable decreases in both power usage and carbon output. https://socialfactories.com/story6242228/high-efficiency-400-kw-chiller-installation-secures-50-000-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-reduction