Penmann recently finalised a complex HVAC upgrade at Danone Nutricia's Liverpool-based production site, supplying a fully engineered ventilation and climate control system engineered to meet strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://thebookmarkplaza.com/story20570377/the-penmann-team-finalises-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme