1

Click here

News Discuss 
The technical feasibility of a heavy haul freight using WDPS (Wireless Distributed Power System) was verified for the first time in Korea. That consisted of a master locomotive. 50 freights and a slave locomotive. The master and slave locomotives were equipped with WDPS to distribute traction and braking control command data. https://www.roneverhart.com/

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story