The programs also include a large battery at the positioning, to ensure excess electric power can be stored with the evening, and a 220 kV transmission line which can join the task towards the North Star sub-station, around in which a fresh a hundred MW solar challenge is likewise remaining https://totalsolar.com.au/13-2kw-solar-system/