The primary park features a capability of 200 MW whilst Sandrini II features a capacity of 100 MW. The whole cost of both initiatives were not disclosed nonetheless, for the duration of design, over two hundred personnel were being employed. The projects are envisioned to see A few positions opening https://commercialsolarpanelinstallation.blogspot.com/2024/12/how-to-save-more-on-your-monthly-energy.html