The 1st park provides a potential of two hundred MW even though Sandrini II incorporates a ability of 100 MW. The full cost of each initiatives weren't disclosed nonetheless, in the course of design, more than two hundred workers have been used. The jobs are anticipated to see a handful https://solarinstallersfresno.business.blog/2024/12/22/what-benefits-you-can-enjoy-by-hiring-the-leading-california-solar-contractors/